+90 (216) 232 36 35 [email protected] LinkedInInstagramFacebook
EN
Scheduled Service

Periodic Maintenance

Planned inspection and recorded maintenance for a system ready in the event of an outage.

Maintenance technician making measurements on generatorField maintenance application
Scheduled Service

Getting a generator ready requires more than just running it regularly.

Engine, alternator, battery, fuel, cooling and control systems are evaluated according to operating hours and calendar intervals. At each maintenance, observations, actions taken and follow-up recommendations are reported.

preventive control

Symptoms that may turn into a malfunction become visible during planned control.

Consumable management

Oil, filter and coolant are handled according to need and maintenance interval.

readiness test

Starting, charging, alarm and transfer scenarios are checked.

Scope of Service

Which systems do we check in maintenance?

01

Engine and fluids

Oil level, leaks, belts, filters and general engine condition.

02

Battery and starter

Battery voltage, connections, charging system and startup performance.

03

Cooling and fuel

Radiator, hoses, fuel line, level and leak checks.

04

Alternator and panel

Electrical values, alarm records, control functions and connections.

Practical Knowledge

Outputs of the care plan

Each visit ends with a service log that makes the next step visible.

  • Control and transaction summary
  • Replaced consumables and parts information
  • Identified risks and recommendations
  • Follow-up note for next maintenance

How is the periodic maintenance interval determined?

The maintenance interval is planned by considering the manufacturer's recommendation, operating hours, calendar time, environmental conditions and the critical usage role of the generator.

  • clear informationCorrect evaluation
  • planned processControlled application
  • technical recordTraceable support
Service Request

Let us create a maintenance plan for your generator.

Sharing the model, operating hours, last maintenance date and facility location is sufficient for the initial evaluation.